Type: Single Family Residence
size: 3600 SF
Location: Pacific Palisades, CA
Scope: Addition & Remodel
Construction budget: $ 2,000,000+
Status: Under Construction
Structural engineer: Gordon Polon Engineering
Civil engineer: Tritech
General Contractor: TBD
This house has survived the pacific palisades fire, (Jan 2025) while all immediately adjacent houses were completely burned down. It is one of the two surviving houses on the street. We believe, this is due to the appropriate design measures and material used for the fire hazard zone area.
See Status of the house after the fire.